PLM Data Migration Services
Migrating Files Is Easy. Migrating Engineering Knowledge Isn’t.
We migrate product structures, relationships, metadata and history—with the context that makes the data usable in the target PLM.
- 30+ PLM migration programmes
- 2B+ records migrated
- Structures & relationships intact
- Validated & reconciled
Source PLM
Oracle Agile PLM · Windchill · Teamcenter · ENOVIA · SmarTeam
Migration
- Data
- Structure
- Relationships
- History
Target PLM
- 3DEXPERIENCE
- Aras Innovator
- Teamcenter
- Windchill
The Migration Challenge
The Data Is Easy. The Relationships Are the Programme.
Moving the records is the easy part. Keeping them connected is the job.
- Part
- BOM
- CAD
- Document
- Change
Break one link and the structure stops working in the target.
“Nothing was lost” should be something you can check, not a promise you have to trust.
Migration Strategy
Choose the Approach Around the Data You Need to Keep.
Scope is set by what the business needs in the target, not by a fixed recipe.
Three questions decide it
- 01What needs to move?
- 02What needs to change on the way?
- 03What only needs to stay accessible?
The approach
Full
All required data and history, moved in one transition.
WhenThe legacy system is being retired.
Selective
Only what active products, processes or business units need.
WhenHistory can stay behind, read-only.
Phased
Controlled stages by product line, site or system; delta runs close the gap.
WhenParts of the business move at different times.
Migration Scope
A PLM Migration Moves More Than Records.
From single attributes to the relationships and history that give them meaning.
01 Record
Product & Item Data
Parts · Items · Attributes · Classifications
02 Relationship
CAD Data
Parts · Assemblies · Drawings
Documents & Files
Documents · Attachments · File links
03 Structure
Product Structures
EBOM · MBOM · CAD-to-BOM links · Configurations
04 History
Engineering History
Revisions · Lifecycle states · Change history
05 Context
Ownership & Access
Owners · Status · Roles · ITAR & EAR controls
PLM Migration Experience
Across the PLM Platforms You Already Use.
We know the source system’s data model as well as the target’s.

3DEXPERIENCE
- Into it from
- Oracle Agile PLM, Windchill, SmarTeam, SOLIDWORKS ePDM, ENOVIA
- Between versions
- 2017x → 2021x
Aras Innovator
- Into it from
- Oracle Agile PLM, Teamcenter, Windchill
- Between versions
- V14 → V28

Teamcenter
- Into it from
- Oracle Agile PLM, legacy PLM and PDM
- Out of it to
- Aras Innovator
Windchill
- Into it from
- Oracle Agile PLM, Pro/INTRALINK, legacy PDM
- Out of it to
- 3DEXPERIENCE, Aras Innovator
Leaving Oracle Agile PLM?
Oracle ends Premier Support for Agile PLM in December 2027. We move Agile items, structures and history into any of these four platforms.
Our Migration Method
A Migration Process You Can Validate at Every Phase.
Repeated cycles find problems early, instead of one cutover that finds them late.
Prepare
- 01
Discover
Source data and scope understood
- 02
Profile
Quality, volume and links assessed
- 03
Map
Source-to-target mappings defined
Iterate
- 04
Transform
Converted for the target model
- 05
Load
Moved into the target
- 06
Validate
Structure, links and rules checked
- 07
Reconcile
Source and target compared
- 08
Refine
Issues fixed by rule, not rewrite
09Repeatuntil every cycle reconciles
Cut over
- 10
Cut Over
Final migration, then hypercare
- 01
Discover
Source data and scope understood
- 02
Profile
Quality, volume and links assessed
- 03
Map
Source-to-target mappings defined
- 04
Transform
Converted for the target model
- 05
Load
Moved into the target
- 06
Validate
Structure, links and rules checked
- 07
Reconcile
Source and target compared
- 08
Refine
Issues fixed by rule, not rewrite
- 10
Cut Over
Final migration, then hypercare
09Repeatuntil every cycle reconciles
Migration Quality
Reconciled, Not Just Copied.
We check the target against the source, so you can verify the migration, not trust it.
Part, BOM, Document, Revision, Relationship: each migrated from the source to the target and reconciled against it.
Reconcile
- Counts
- Structure
- Relationships
- Attributes
- Exceptions
Every migration cycle gives us evidence for the next one.
Delivered Migrations
The Programmes Behind the Method.
Each figure belongs to one programme, shown with its route and its customer.
40+ applications → 3DEXPERIENCE
1B+
records in one programme
The largest we have run. The story is one load from it: Windchill Product Analytics.
Ericsson · Sweden · High-tech
SmarTeam, ePDM → 3DEXPERIENCE
9M
objects, relationships and files
Three sources, selective and phased, live inside 2–3 days.
Denmark · Industrial equipment
Designer Central → POWER’BY
10 months
upgrade, migration and testing
No stop in operations during the transition.
MTorres · Spain · Machinery manufacturing
Aras Innovator
V14 → V28
fourteen major versions
A highly customised estate, with CI/CD and access control put in.
Global · Consumer goods
Teamcenter → Aras
10 years
of Teamcenter data
Structures, revisions and CAD links verified on both sides of go-live.
Aerospace supplier
Windchill → Aras
Every phase
reconciled, dry runs timed
Effectivity and lifecycle states carried across intact.
Industrial OEM
Plan Your Migration
Move Your PLM Data Without Losing the Knowledge Inside It.
Moving from another PLM, consolidating systems, upgrading, or bringing history forward—we will help define the scope, approach and validation strategy.
FAQ
Questions We Get Asked.
Into and between 3DEXPERIENCE, Aras Innovator, Teamcenter and Windchill. Sources include Oracle Agile PLM, ENOVIA, SmarTeam, SOLIDWORKS PDM, Pro/INTRALINK, Documentum, Autodesk Vault and custom systems.
Yes. Oracle ends Premier Support for Agile PLM in December 2027. We migrate Agile items, BOMs, documents, changes and history into 3DEXPERIENCE, Aras Innovator, Teamcenter or Windchill, starting with an assessment of what has to move.
Structures move as structures: types and relationships load in dependency order, and broken or missing links are repaired on the way in. After every load the target is reconciled against the source on counts, structure, relationships and attributes, and every exception is resolved before the next cycle.
Yes. Full revision history can move, or only the latest released revisions where that is all the target needs. Revision schemes are adapted to the target’s rules, and change history moves with the objects it describes.
No. Migration runs in rehearsed cycles, and delta runs carry across changes made since the previous run, so the final cutover moves only what changed. One multi-site programme went live inside a 2–3 day window; another moved with no stop in operations.